WESTERN ENGINEERING
CONSULTANTS LTD.
 

 

CONSTRUCTION PHOTOS

A. Buildings

Delta Hotel Sea Island Richmond, B.C.
Located on the banks of the Fraser river, thefirst building in Richmond to have a full basement in a high water table below sea level.
Delta Hotel Sea Island Richmond, B.C.
Under construction
Tower 801 Seattle, Washington USA
Placing of reinforcing for core foundation for seismic resistance
Tower 801 Seattle, Washington USA
Under construction
Plaza Four, Tacoma Washington USA
Under construction

B. Micro-duct trenching

Demonstration at the University of Trinidad & Tobago, Trinidad West Indies

Preparing the micro-duct trench 1/2'' +/- wide x 6'' deep Placing the cable into the micro-duct
Seating the cable into the duct Compacting the backfill over the cable
The Mini Breeze Machine used in demonstrations. Capable of air blowing fibre 1500 ft Fibre at end of cable in demonstration
The Breeze Machine used in construction. Capable of air blowing fibre 4000 ft
 
phone: 604.214.0877 fax: 604.273.9855 7260 No 4 Road, Richmond, British Columbia, Canada V6Y 2T3 info@wecl.ca